The first measurement is 18.2m;
The second measurement is 927cm;
[tex]\begin{gathered} \\ 100\operatorname{cm}=1m \\ 927\operatorname{cm}=\frac{927}{100}m \\ 927\operatorname{cm}=9.27m \end{gathered}[/tex]The third measurement is 0.044km;
[tex]\begin{gathered} 1000m=1\operatorname{km} \\ 0.044\times1000m=0.044\operatorname{km} \\ 44m=0.044\operatorname{km} \end{gathered}[/tex]Thus, the total length of the kite string is;
[tex]18.2m+9.27m+44m=71.47m[/tex]CORRECT ANSWER: 71.47m