Luthan Company uses a plantwide predetermined overhead rate of $23.90 per direct labor-hour. This predetermined rate was based on a cost formula that estimated $286,800 of total manufacturing overhead cost for an estimated activity level of 12,000 direct labor-hours. The company incurred actual total manufacturing overhead cost of $266,000 and 11,100 total direct labor-hours during the period.

Required:
Determine the amount of manufacturing overhead that would have been applied to units of product during the period.