Oldham Corporation bases its predetermined overhead rate on a variable manufacturing overhead cost of $4.00 per machine-hour and fixed manufacturing overhead cost of $87,822 per period. If the denominator level of activity is 4,100 machine-hours, what would be the fixed component in the predetermined overhead rate