A crate is lifted vertically 1.5 m and then heldat rest. The crate has weight 100 N (i.e., it issupported by an upward force of 100 N).How much work was done in lifting thecrate from the ground to its final position?1. More than 150 J2. 150 J3. A bit less than 150 J4. No work was done.5. None of these