Answer: 95metres for the length and the original cost is 2.105
Step-by-step explanation:
Let the initial length be x,
So, x+5=200/2
x+5=100
x=95
Note since the total price is the same and the original length is 95metres.
Therefore, the original cost per metre is
200/95=2.105