There are two stages associated with allocating manufacturing overhead in an activity-based costing system. Which stages are they?
a. Allocating the activity cost pools to production using multiple cost drivers.
b. Identifying and creating a single activity cost pool.
c. Identifying and creating separate activity cost pools.
d. Allocating the activity cost pools to production using the same cost driver for each pool.